Besides wheelin', we managed to get two BIG projects done. First, we moved the hot tub into place on the deck. That was a real challenge as it was down at the bunk house and had to be moved about 500 feet uphill. With 7 guys and 5 women helping, we managed to get it up to the deck and lowered into it's final resting spot. Now we're awaiting electrical hookups and then H2O to make this project complete.One man, 5 woman hot tub vs. one woman, 7 man hot tub. Which would you prefer?
Thanks everyone! Tool Man, New Bob, Rusty, Rooster, Zacklee's, and the Rowdy Redneck Team.
In addition to the hot tub, Rooster fixed a plumbing leak at the bunk house and Zacklee's helped us mount a new wall hanging on the second floor wall. Last but not least, Monkey Zack swung out onto the rafters to give them a good dusting.